Here's how calendar compares between

Sign in with Google to compare your calendar with peers

Design, Mid

vs.

Engineering, Mid

Focus Time

16% more Focus time vs. Design, Mid

Design, Mid

19.1 hr

Engineering, Mid

22.2 hr

Meetings

14% less Meetings vs. Design, Mid

Design, Mid

10.6 hr

Engineering, Mid

9.3 hr

Fragmented Time

3% more Fragmented time vs. Design, Mid

Design, Mid

5.8 hr

Engineering, Mid

6.0 hr

One-on-One Meetings

20% less One-on-One vs. Design, Mid

Design, Mid

0.3 hr

Engineering, Mid

0.3 hr

Adhoc Meetings

24% less Adhoc meetings vs. Design, Mid

Design, Mid

2.6 hr

Engineering, Mid

2.1 hr

Team sync Meetings

31% more Team syncs vs. Design, Mid

Design, Mid

2.8 hr

Engineering, Mid

3.7 hr

External Meetings

100% less External meetings vs. Design, Mid

Design, Mid

0.5 hr

Engineering, Mid

0.3 hr

Other Related Benchmarks

Engineering, Executive vs. Design, Executive

Engineering, Director vs. Design, Director

Engineering, Entry vs. Design, Entry

Engineering, Manager vs. Design, Manager

Engineering, Senior vs. Design, Senior