Here's how calendar compares between

Sign in with Google to compare your calendar with peers

Design, Entry

vs.

Engineering, Entry

Focus Time

31% less Focus time vs. Design, Entry

Design, Entry

11.6 hr

Engineering, Entry

8.9 hr

Meetings

17% more Meetings vs. Design, Entry

Design, Entry

15.0 hr

Engineering, Entry

17.6 hr

Fragmented Time

14% more Fragmented time vs. Design, Entry

Design, Entry

5.5 hr

Engineering, Entry

6.3 hr

One-on-One Meetings

50% more One-on-One vs. Design, Entry

Design, Entry

1.4 hr

Engineering, Entry

2.1 hr

Adhoc Meetings

18% more Adhoc meetings vs. Design, Entry

Design, Entry

3.2 hr

Engineering, Entry

3.8 hr

Team sync Meetings

42% more Team syncs vs. Design, Entry

Design, Entry

3.0 hr

Engineering, Entry

4.3 hr

External Meetings

3% less External meetings vs. Design, Entry

Design, Entry

1.1 hr

Engineering, Entry

1.1 hr

Other Related Benchmarks

Engineering, Executive vs. Design, Executive

Engineering, Director vs. Design, Director

Engineering, Manager vs. Design, Manager

Engineering, Senior vs. Design, Senior

Engineering, Mid vs. Design, Mid