Here's how calendar compares between

Sign in with Google to compare your calendar with peers

Engineering, Entry

vs.

Design, Entry

Focus Time

31% more Focus time vs. Engineering, Entry

Engineering, Entry

8.9 hr

Design, Entry

11.6 hr

Meetings

17% less Meetings vs. Engineering, Entry

Engineering, Entry

17.6 hr

Design, Entry

15.0 hr

Fragmented Time

14% less Fragmented time vs. Engineering, Entry

Engineering, Entry

6.3 hr

Design, Entry

5.5 hr

One-on-One Meetings

50% less One-on-One vs. Engineering, Entry

Engineering, Entry

2.1 hr

Design, Entry

1.4 hr

Adhoc Meetings

18% less Adhoc meetings vs. Engineering, Entry

Engineering, Entry

3.8 hr

Design, Entry

3.2 hr

Team sync Meetings

42% less Team syncs vs. Engineering, Entry

Engineering, Entry

4.3 hr

Design, Entry

3.0 hr

External Meetings

3% more External meetings vs. Engineering, Entry

Engineering, Entry

1.1 hr

Design, Entry

1.1 hr

Other Related Benchmarks

Design, Executive vs. Engineering, Executive

Design, Director vs. Engineering, Director

Design, Manager vs. Engineering, Manager

Design, Senior vs. Engineering, Senior

Design, Mid vs. Engineering, Mid