Here's how calendar compares between

Sign in with Google to compare your calendar with peers

Engineering, Mid

vs.

Design, Mid

Focus Time

16% less Focus time vs. Engineering, Mid

Engineering, Mid

22.2 hr

Design, Mid

19.1 hr

Meetings

14% more Meetings vs. Engineering, Mid

Engineering, Mid

9.3 hr

Design, Mid

10.6 hr

Fragmented Time

3% less Fragmented time vs. Engineering, Mid

Engineering, Mid

6.0 hr

Design, Mid

5.8 hr

One-on-One Meetings

20% more One-on-One vs. Engineering, Mid

Engineering, Mid

0.3 hr

Design, Mid

0.3 hr

Adhoc Meetings

24% more Adhoc meetings vs. Engineering, Mid

Engineering, Mid

2.1 hr

Design, Mid

2.6 hr

Team sync Meetings

31% less Team syncs vs. Engineering, Mid

Engineering, Mid

3.7 hr

Design, Mid

2.8 hr

External Meetings

100% more External meetings vs. Engineering, Mid

Engineering, Mid

0.3 hr

Design, Mid

0.5 hr

Other Related Benchmarks

Design, Executive vs. Engineering, Executive

Design, Director vs. Engineering, Director

Design, Entry vs. Engineering, Entry

Design, Manager vs. Engineering, Manager

Design, Senior vs. Engineering, Senior