Here's how calendar compares between

Sign in with Google to compare your calendar with peers

Engineering, Mid

vs.

Product, Mid

Focus Time

77% less Focus time vs. Engineering, Mid

Engineering, Mid

22.2 hr

Product, Mid

12.5 hr

Meetings

58% more Meetings vs. Engineering, Mid

Engineering, Mid

9.3 hr

Product, Mid

14.8 hr

Fragmented Time

21% more Fragmented time vs. Engineering, Mid

Engineering, Mid

6.0 hr

Product, Mid

7.3 hr

One-on-One Meetings

167% more One-on-One vs. Engineering, Mid

Engineering, Mid

0.3 hr

Product, Mid

0.7 hr

Adhoc Meetings

89% more Adhoc meetings vs. Engineering, Mid

Engineering, Mid

2.1 hr

Product, Mid

4.0 hr

Team sync Meetings

13% more Team syncs vs. Engineering, Mid

Engineering, Mid

3.7 hr

Product, Mid

4.2 hr

External Meetings

247% more External meetings vs. Engineering, Mid

Engineering, Mid

0.3 hr

Product, Mid

0.9 hr

Other Related Benchmarks

Product, Executive vs. Engineering, Executive

Product, Director vs. Engineering, Director

Product, Entry vs. Engineering, Entry

Product, Manager vs. Engineering, Manager

Product, Senior vs. Engineering, Senior