Here's how calendar compares between

Sign in with Google to compare your calendar with peers

Engineering, Mid

vs.

Operations, Mid

Focus Time

10% less Focus time vs. Engineering, Mid

Engineering, Mid

22.2 hr

Operations, Mid

20.1 hr

Meetings

2% more Meetings vs. Engineering, Mid

Engineering, Mid

9.3 hr

Operations, Mid

9.5 hr

Fragmented Time

7% less Fragmented time vs. Engineering, Mid

Engineering, Mid

6.0 hr

Operations, Mid

5.6 hr

One-on-One Meetings

47% more One-on-One vs. Engineering, Mid

Engineering, Mid

0.3 hr

Operations, Mid

0.4 hr

Adhoc Meetings

18% more Adhoc meetings vs. Engineering, Mid

Engineering, Mid

2.1 hr

Operations, Mid

2.5 hr

Team sync Meetings

57% less Team syncs vs. Engineering, Mid

Engineering, Mid

3.7 hr

Operations, Mid

2.4 hr

External Meetings

47% more External meetings vs. Engineering, Mid

Engineering, Mid

0.3 hr

Operations, Mid

0.4 hr

Other Related Benchmarks

Operations, Executive vs. Engineering, Executive

Operations, Director vs. Engineering, Director

Operations, Entry vs. Engineering, Entry

Operations, Manager vs. Engineering, Manager

Operations, Senior vs. Engineering, Senior